Ridgecast Works Unit 2, Forge Park, Sheffield S9 1HFApplications desk: +44 (0)114 244 0180
RRidgecastCrushing · Screening · Conveying
Ridgecast Works/Production lines/Quarry Aggregate Plant
Line · Aggregate

Quarry Aggregate Plant

Three-product quarry plant with a published wear cycle.

A three-product quarry plant for roadstone: jaw, cone, triple-deck, and a published liner and mesh cycle. Built for a single shift and a Saturday wash-down.

Applicable products & materials

Products

0/4, 4/20, and 20/40 to EN 12620, or the local road spec.

Materials

Limestone and granite quarry face, UCS 80–180 MPa.

Process steps

01

Face to jaw

RC-J1200 at the face or a short haul to the pad.

02

Split

RC-S2460 makes three products; oversize to the cone.

Delivery scope

Design — circuit designCustom build — custom fabricationInstall — erectionTrain — training

Gallery

Quarry Aggregate Plant
Quarry Aggregate Plant
Quarry Aggregate Plant
Quarry Aggregate Plant

The wear cycle is published before you buy.

Liner and mesh change-outs are in the quote, not discovered in year two. Ask the applications desk for the cycle sheet.

Contact the works