Ridgecast Works/Services/Erection and Commissioning
Service · On the padErection & Commissioning
Pad supervision, first ore, and a signed CSS and stroke sheet.
Ridgecast supervisors on the pad: grout, align, first ore, and a written CSS and stroke sheet. The plant is not handed over on a handshake.
Service items
Erection
Supervisor and a fitter; crane and civils are the mine's.
First ore
A written sheet, not a photo of a pile.
Deliverables
Alignment report
Shafts and pulleys to the drawing.
First-ore sheet
CSS, stroke, and amps at the agreed t/h.
How it runs
01
Set
Grout and align.
02
Turn
Empty run.
03
Ore
Signed first-ore sheet.
Gallery


Handover is a sheet, not a handshake.
The first-ore sheet drives your wear forecast for the next six months. Book erection with the steel order to hold the slot.